Issue |
Rev. Fr. Geotech.
Number 164, 2020
|
|
---|---|---|
Article Number | 1 | |
Number of page(s) | 20 | |
DOI | https://doi.org/10.1051/geotech/2020019 | |
Published online | 07 October 2020 |
Article de recherche / Research Article
Déplacements induits par les tunneliers : rétro-analyse de chantiers en milieu urbain sur la base de calculs éléments finis en section courante
Displacements induced by tunnel boring machines: inverse analysis of construction sites in urban areas based on finite element calculations in current section
1
Centre d’Études des Tunnels (CETU),
25, avenue F. Mitterrand,
69500
Bron, France
2
École Nationale des Travaux Publics de l’État (ENTPE), LTDS – UMR CNRS 5513,
3, rue Maurice Audin,
69518
Vaulx-en-Velin, France
★ Auteur de correspondance : nicolas.berthoz@developpement-durable.gouv.fr
L’estimation des déplacements induits par le creusement au tunnelier sur des constructions avoisinantes (immeubles, ouvrages d’art, tunnels, réseaux…) est une étape essentielle des projets d’ouvrages souterrains en zones urbaines. De cette estimation sont, en effet, déduits ou adaptés des choix forts de conception tels que le tracé du tunnel, le dimensionnement du tunnelier (surcoupe, conicité…) et le choix de ses paramètres de pilotage (pression frontale, pression de bourrage…). Cet article présente des comparaisons entre les résultats de calculs éléments finis 2D et six sections instrumentées d’ouvrages réels. L’ensemble des paramètres nécessaires à la modélisation (modèle géotechnique et paramètres de creusement du tunnelier) est décrit de manière explicite. Ces rétro-analyses permettent de mieux cerner les paramètres clés du problème, en particulier le rôle majeur des pertes de volume induites le long de la jupe du tunnelier.
Abstract
Estimating the displacements induced by tunneling on neighboring constructions (buildings, engineering structures, tunnels, networks, etc.) is an essential step in underground work projects in urban areas. Indeed, strong design choices such as the layout of the tunnel, the design of the tunnel boring machine (overcut, taper, etc.) and the choice of its control parameters (face pressure, grouting pressure, etc.) are deduced or adapted from this estimate. This article presents comparisons between the results of 2D finite elements calculations and six instrumented sections of real structures. All the parameters required for modeling (geotechnical model and tunnel boring parameters) are explicitly described. These inverse analyses make it possible to better identify the key parameters of the problem, in particular the major role of the volume losses induced along the shield tail.
Mots clés : tunnel / tunnelier / déplacements induits / tassements / calcul éléments finis / mesures in situ
Key words: tunnel / TBM / displacements induced / settlements / finite elements calculations / in situ measurements
© CFMS-CFGI-CFMR-CFG, 2020
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.