REX en conception, contrôle d’exécution et suivi à long terme de tirants d’ancrages précontraints
Case histories on design, work control and monitoring for prestressed ground anchors
EGIS – Géotechnique,
Grenoble, France
* Auteur de correspondance : dominique.allagnat@egis.fr
Les ouvrages géotechniques complexes imposent parfois le recours à la technologie des tirants d’ancrage précontraints. Ces éléments qui garantissent la stabilité des ouvrages, nécessitent une attention particulière, tant dans la conception que lors de la mise en œuvre ainsi que le suivi de leur pérennité tout au long de la durée de service. Le présent article s’attache à faire la synthèse d’un REX représentant plusieurs dizaines d’ouvrages, totalisant plusieurs milliers de tirants d’ancrage, avec pour certains d’entre eux une période de suivi supérieure à 30 ans. Quelques exemples types sont détaillés : murs de soutènement, renforcement de fondation d’ouvrage d’art, structure de ponts suspendus et renforcement de barrages. Chaque exemple est présenté dans son contexte géologique et géotechnique et les résultats du suivi à long terme sont commentés lorsqu’ils sont disponibles. Il en ressort que l’application rigoureuse des recommandations, initiées par Pierre Habib dans les années 1970, permet d’atteindre un niveau de maîtrise technique et de qualité adapté pour garantir la pérennité des ouvrages géotechniques. Enfin, on suggère quelques recommandations complémentaires pour la conception des nouveaux ouvrages géotechniques pour lesquels la stabilité est assurée par des tirants d’ancrage précontraints.
Abstract
Complex geotechnical structures may involve the use of prestressed anchor technology. These elements, guaranteeing the stability of the structures, require special attention both at the conception and the implementation stages, as well as the monitoring of their durability throughout their operational life. This article summarises the case histories of several dozen structures, totalling several thousand tie rods, including some that have been monitored for over 30 years. Some typical examples are given: retaining walls, reinforcement of bridge foundations, suspension bridge structures and reinforcement of dams. Each example is presented in its geological and geotechnical context and, where available, long-term monitoring results are commented on. It is demonstrated that a strict application of the recommendations, initiated by Pierre Habib in the 1970s, makes it possible to achieve an optimal level of technical mastery and quality in order to guarantee the durability of geotechnical structures. Finally, this article provides additional recommendations for the conception of new geotechnical structures, whose stability is guaranteed by the use of pre-stressed anchors.
Mots clés : tirants d’ancrage / retour d’expérience / murs de soutènement / fondations / instrumentation
Key words: ground anchors / case histories / retaining walls / foundations / monitoring
© CFMS-CFGI-CFMR-CFG, 2021
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.