Free Access
Fig. 10

Download original image
(a) Champ de porosité 3D à l’état initial. Coupes verticales du champ 3D (b) avant (c) après fonçage du pieu et (d) après 500 cycles.
(a) 3D field of porosity prior to testing. Vertical slices taken through the 3D field of porosity (b) prior to testing, (c) after pile installation and (d) after 500 cycles.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.