Free Access

Fig. 11

image

Download original image

Contact grès altéré (a)/siltite (b) entre la zone 1 et le Sud de la station présentée dans la figure 10 en cours d’excavation.

Altered sandstone (a)/siltstone (b) contact between zone 1 and the south of metro station in Figure 10 during excavation.

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.