Fig. 2

Download original image
Le barrage de Malpasset peu après sa rupture. À gauche, la rive gauche avec la trace du dièdre de rocher emporté ; à droite, la rive droite avec le bas du barrage intact mais une crevasse décimétrique ouverte à l’amont dans sa fondation.
The Malpasset dam shortly after its rupture. On the left, the left bank with the trace of the dihedral of rock carried away; on the right, the right bank with the bottom of the dam intact but a decimetric crevice open upstream in its foundation.
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.